Login


    Regist

Menü

Clan Menü

Server Menü

Geburtstag
Stiefel hat am 17.10.2018 Geburtstag
 
Marcel hat am 30.10.2018 Geburtstag
 
killergirl hat am 30.10.2018 Geburtstag

  » Forum » Öffentliche Foren » Geburtstagsgrüße & Glückwünsche » In the crusher production process

In the crusher production process
gjsohcat Gcat
Mitglied

User Pic

Posts: 21
# 26.09.2018 - 09:11:59
    zitieren



Come to talk about the crushing plant counterattack broken, its appearance is generally used as two stage grinding, but this is the flexible use, if the customer must as a direct broken it is permissible, today the main speakers as the two stage crushing plays a huge role.

First of all, it is divided into PF and PFV two types, the two are crushing equipment use of impact energy to crushing material. In the material after the first level after breaking into the gravel plant, back breaking silo, the material by high speed impact plate hammer, crushing matter will be left to continue installation crushing the impact device above the rotor, and then play back plate plate hammer active region to be countered and from counterattack lining, since this back and forth, back cavity different with different size of material, the material into the back chamber is uniform after breaking into a standard size will away from stone crusher.

In the production process, it also exists the problems due to the high speed running of the bearing, makes the temperature is too high, hammering and stone in the crushing, aiming at these problems, the following good advice, the middle stop working and clean up the broken stone, but also to the gap between the fastening and hammer check lining plate and lining board timely replacement of fracture, in order to guarantee the normal work.
Sponsoren

Umfrage
keine Umfrage vorhanden

Nextwar
kein War geplant

Statistik
Gesamt: 606989
Heute: 374
Gestern: 435
Online: 24
... mehr

Online
offline0 User

offlinefengqingxue
offlineqizhen0809
offlineSletrry
offlinelaiyongcai92
offlineyaya2018

online14 Gäste